Continuing to work on the road near end bent 1 and toward the south end of the project. Cutting to grade and building up where needed.
Rip rap getting installed on north side of end bent 4.
Rip rap fully installed on box culvert.
View of the road from the south end of the project.
Continued.. working down the hill.
Continued.. down near end bent 1.