Round Mountain Bridge - 8/11/2021
View of the road from the south side of the project.
Working on getting the old road removed.
Down by end bent 1 approach.
Rip rap in on the south side of end bent 4.
Prepping for rip rap install on the other side of end bent 4.
View of the road between end bent 4 and box culvert.


Box culvert rip rap going in today.

View of the east edge of the road.

View of the west edge of the road.

Box culvert rip rap going in today.
View of the east edge of the road.
View of the west edge of the road.
Comments
Post a Comment