Round Mountain Bridge - 4/8/2021
A view of the project from the south end.
Concrete boxes delivered to use beneath the creek crossing. The pipes that were previously installed are not allowing enough flow.
A view from the south side of the project. Rock is being spread out and compacted on the east side of Round Mountain road.
Crew getting corners for box culvert set.
Had to add a load of rock to a soft spot at the box culvert. Engineer approved.
Rock continues to be delivered. Dozer leveling it out on west side of creek now.
Excavation for the box culvert.
Getting the proper depth for the box culvert. Plan to pour next week.