View of bridge from end bent 1. Removing overhang brackets on downstream side of bridge. Removing overhang brackets on upstream side of bridge. Overhang brackets being loaded up to be hauled off site. Forms and other materials being hauled off site. View of the bridge deck.
Dozer used to clear and level things off. Equipment on site. Rebar delivered this morning. Stored rebar off the the east side of the river. Silt sock installed today. South end of project. North end of project. Leveling out the surface and collecting the black dirt. View from the north end of the project.