Round Mountain Bridge - 3/31/2021
Traffic control is set up for the job.
Job board is set up for the job. Couple things to add that were discussed with contractor.
Discussed this low water crossing with engineer and contractor. County is having a meeting on Monday about it, that will give us direction on what to do.
Utility pole that was relocated on the North end.
Comments
Post a Comment